• SWN BCH Bldg small converted

    BC Hydro Sub Station Control Buildings

    CANbuild Solutions was contracted to supply and install two pre-engineered metal buildings for BC Hydro's South Wellington and Buckley Bay Substations on Vancouver Island.  These post disaster buildings utilising insulated metal panels will stand the test of time.

  • North Island College Kitchen Exterior

    North Island College Kitchen

    The new Teaching Kitchen is now up and operational for the Port Alberni North Island College Campus.  The aim of this project was to provide a first-class, fully-equipped professional kitchen to allow the college to expand their culinary program, and to offer students with an on-campus training facility.  The kitchen provides 2,900sq.ft of workspace, with 18 student stations, pastry stations, cooking stations, and a separate dishwashing area.  Additionally there is a 24-seat dining room that will double as a classroom.

  • Environmental Construction

    The typical CANbuild steel building is manufactured from at least 70% recycled steel. To top that, at the end of its useful life, 100% of a steel-frame building can be recycled into a variety of steel products including new cars, appliances, buildings and bridges.

    Contact Us Today
  • Manufacturing & Industrial

    CANbuild offers complete flexibility of layout and workflow, allows for use of cranes and other heavy equipment as required in most manufacturing and industrial applications, while also allowing for fast, economical future building expansion if required.

    Contact Us Today
  • Recreation

    CANbuild custom-designed clear span systems from American Buildings meet all open playing and spectator space needs, along with locker, child-care, lounge, foodservice, and other related facility requirements to ensure a quality building that exceeds expectations and build's value well into the future of Vancouver Island's community's and family's experiences.

    Contact Us Today
  • HCCB

    City of Nanaimo Covered Sport Facility

    CANbuild Solutions were pleased to have been awarded the contract to supply and install a pre-engineered metal building for the City of Nanaimo Centennial Park on Vancouver Island. This 220' by 110' building will host lacrosse and other funactions in cooperation with the John Barsby High School.

Design-Build Construction Uses a Unified Work Flow

What Is Design-Build?

Design-build consists of one entity, one contract, and one unified flow of work from initial concept through completion.

Learn More
We Work Hard To Earn Your Trust

Earning Your Trust

Responsibility, communication, innovation, efficiency, openness, honesty and above all respect for our client. Those are our values.

Learn More
Canbuild Smart Solutions Work With a Wide Range of Industries

Industries We Work With

We're not limited to working within a small number of industries. Auto dealerships, warehouses, and everything in between; we’re ready to help.

Learn More

Design-Build : Focused on the Client

Design-Build Construction Is At the Forefront of Green Building

Design-Build construction is environmentally friendly. Metal building systems set the standard for sustainability and "Green" as steel is the most recycled material on the planet.

What Is Design-Build?

A construction project should be focused on you, plain and simple. You, should be listened to, respected and be provided with insightful and focused guidance. Responses to your questions or requests should be attentive, thoughtful and comprehensive. Desgin-build construction shifts the focus of construction projects onto our clients, you, to ensure the very best of results.

Design-build projects consist of a single design-build team. This team works under a single contract with you to provide all design and construction services. There is one team, one contract, and one unified workflow from initial concept through completion.

Design-build reduces risks and overall costs, while increasing the quality and aesthetic of the finished project.

How Does Design-Build Work?

We assemble a team of experts—all highly motivated—who will develop the design, draft the plans and construct the building. This makes it is possible to enhance meet all of your needs while lowering the construction costs.

The greatest results come from open and honest communication, so engaging is integrated into the Design and Build approach. Design-build results in the highest quality, aesthetics, environmental sustainability, future expansion, functionality, schedule and cost.

The design-build procurement route changes the traditional sequence of work. It answers the client's wishes for a single-point of responsibility to reduce risks and overall costs, while increasing the quality and aesthetic of the finished project. An early “Real World” estimate is incorporated before Working Drawings are completed, allowing for any changes necessary to align with budgets at the concept stage, avoiding the expense and delay of full redrafting of the Working Drawings.

Design Process

In this process we assemble an inclusive group of experts in their respective fields, who are motivated “project team members” developing the design, plans and solutions using function, aesthetic and quality as their guiding principles. In this way it is possible to creatively enhance the project while finding ways to reduce construction costs without reducing the functionality of the final product.

Highlights of our design process include:

  1. Stakeholder’s inputs are collected into the development of the Conceptual Design.
  2. Involvement of professional engineers, consultants, and suppliers and related trades to collaborate and drive in-depth conceptual solutions.
  3. Review, refinement and approval of Conceptual Drawings and Estimates.
  4. Early Conceptual Costing to assess viability to the budgets.
  5. Approval of Conceptual Design and related Budgets prior to development of working drawings.

Schedule, Build & Commission

As many projects are managed within tight timeframes, an advantage of this process is in the fact the schedule can be advanced with site activities beginning earlier than normal. This is due to the established General Contractor’s ability, under agreement with the owner, to mobilize early and commence primary site development while the final stages of design and permitting are being completed.

In the build, the earliest stage of the foundation can commence early as well, ahead of permit, if assurances can be achieved with the municipality the permit will be approved without changes.

Commissioning of all systems is executed at the final stages of the build assuring all operations of the building are fully functioning. In the last days prior to turn over, a review will be scheduled and conducted with those using and operating the building to familiarize all with its operation.

CANbuild Smart Solutions

Contact us today to begin Phone: 888.406.6884 your commercial construction project: 888.406.6884

 


 

Add to Address BookClick to add CANbuild Smart Solutions
to your Address Book

 


Email Canbuild Smart Solutionsto start you commercial construction project today.


1000 characters left